Wasl Tower
In October 2017, UNStudio and Werner Sobek unveiled their design for a new Dubai skyscraper with what has been described as the 'world's tallest ceramic facade'.
Wasl Tower will be located in an exceptional, central position along Sheikh Zayed Road, the main thoroughfare that connects the Emirates north to south - and directly opposite the world's tallest building, the Burj Khalifa.
The 300 m-high skyscraper is designed with a twisted, asymmetric shape and will be clad in glazed clay tiles that interlace to form sweeping curves. According to the designers, their concept adopts the principle of 'counterpose', a form in classical sculpture which involves one foot taking more weight and the shoulders and hips being naturally twisted off-axis.
The facade will be illuminated at night in a programmed rhythm, giving the impression that the building is breathing. Developed by Arup, the lights will be positioned behind the fin-shaped tiles and will be powered through solar panels installed on the roof of a nearby car park. The carefully-angled tiles will also provide shade whilst allowing natural light to filter into the building.
The mixed-use building will be operated by hotel group Mandarin Oriental and, in addition to a hotel, will contain offices, private apartments, and public spaces. An open seam will run the full height of the tower, forming a 'vertical boulevard' of stacked outdoor balconies and greenery, with an infinity pool at the top.
Construction began in 2016, and is scheduled to complete in 2020.
Content and images courtesy of UNStudio.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.